Code · CFR · Title 15 — Commerce and Foreign Trade · Part 700 — Defense Priorities and Allocations System · § 700.18

§ 700.18. Limitations on placing rated orders.

348 words·~2 min read·/us/cfr/t15/s§ 700.18·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)General limitations.
(1)A person may not place a rated order pursuant to this part unless the person is in receipt of a rated order, has been explicitly authorized to do so by the Department of Commerce or a Delegate Agency or is otherwise permitted to do so by this part.
(2)Rated orders may not be used to obtain:
(i)Delivery on a date earlier than needed;
(ii)A greater quantity of the item than needed, except to obtain a minimum procurable quantity;
(iii)Items in advance of the receipt of a rated order, except as specifically authorized by the Department of Commerce (see § 700.51(c) for information on obtaining authorization for a priority rating in advance of a rated order); or
(iv)Any of the following items unless specific priority rating authority has been obtained from a Delegate Agency or the Department of Commerce:
(A)Items for plant improvement, expansion, or construction, unless they will be physically incorporated into a construction project covered by a rated order; or
(B)Production or construction equipment or items to be used for the manufacture of production equipment (for information on requesting priority rating authority, see § 700.51).
(v)Any items related to the development of chemical or biological warfare capabilities or the production of chemical or biological weapons, unless such development or production has been authorized by the President or the Secretary of Defense.
(3)Separate rated orders may not be placed solely for obtaining minimum procurable quantities on each order if the minimum procurable quantity would be sufficient to cover more than one rated order.
(b)Specific item limitations. Notwithstanding any authorization or requirement to place a rated order stated elsewhere in this part, no person may place a rated order to obtain the following items unless such order is authorized by an official action of the Department of Commerce.
(1)Copper raw materials.
(2)Crushed stone.
(3)Gravel.
(4)Sand.
(5)Scrap.
(6)Slag.
(7)Steam heat, central.
(8)Waste paper. \[79 FR 47566, Aug. 14, 2014, as amended at 89 FR 58972, July 22, 2024\]
Connections6 cite this
Citation graph
cites case law
§ 700.18
Limitations on placing rated orders.
Fed. Reg.×6
Cites 0Cited by 6 across 1 source
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.